Our Professional Step-by-Step Process
1. Design Layout
The pool design is painted and staked on the property, per the sales agreement. The pool elevation and equipment location will be determined at this time.
The pool design is painted and staked on the property, per the sales agreement. The pool elevation and equipment location will be determined at this time.
2. Excavation
Forming and excavation of the swimming pool will be completed per the design.
Forming and excavation of the swimming pool will be completed per the design.
3. Steel
Rebar reinforced steel will be formed to match your pool design within the excavated area.
Rebar reinforced steel will be formed to match your pool design within the excavated area.
4. Bonding Inspection
County Inspection is completed.
County Inspection is completed.

5. Short Stub Plumbing
The return lines, skimmers and main drain will be installed to help streamline the construction process.
The return lines, skimmers and main drain will be installed to help streamline the construction process.
6. Concrete Shell
The wet-mix shotcrete shell of your swimming pool will be sculpted, matching the detail of your specs.
The wet-mix shotcrete shell of your swimming pool will be sculpted, matching the detail of your specs.
7. Plumbing/Electric/Gas
The equipment will be set, and the plumbing lines will be run in ditches to ensure their safety. The electrical lines will be located in the same trenches and tied into your home’s electrical panel. Gas will follow if necessary.
The equipment will be set, and the plumbing lines will be run in ditches to ensure their safety. The electrical lines will be located in the same trenches and tied into your home’s electrical panel. Gas will follow if necessary.
8. Underground Inspection
County Inspection is completed. The electrical and gas lines will be inspected by a county inspector.
County Inspection is completed. The electrical and gas lines will be inspected by a county inspector.

9. Deck Grading & Bonding
The trenches will be covered, and a copper wire will be bonded to the rebar in the pool.
The trenches will be covered, and a copper wire will be bonded to the rebar in the pool.
10. Bonding Inspection
County Inspection completed.
County Inspection completed.

11. Tile & Coping
The custom tile and coping you choose will be installed.
The custom tile and coping you choose will be installed.
12. Decking
We will meet at this point to lay out the decking area, after which the deck will be installed (concrete, pavers, etc).
We will meet at this point to lay out the decking area, after which the deck will be installed (concrete, pavers, etc).
13. Plaster/Pebble Tec
The interior finish of your choice will be applied to the shotcrete shell of your pool.
The interior finish of your choice will be applied to the shotcrete shell of your pool.
14. Fill Your Pool
Fill your pool using your home spigot or by tanker truck.
Fill your pool using your home spigot or by tanker truck.
15. Indoctrination
We will schedule a meeting to assist you in the operation of your pool equipment (Pool School).
We will schedule a meeting to assist you in the operation of your pool equipment (Pool School).
16. Final Inspection
County Inspection completed.
County Inspection completed.